House Day 2
We're putting tiles on the wall behind the stove in the kitchen. Originally it was to be 3 custom-painted tiles in a field of cobalt blue 2" tiles on the backsplash behind the stove. We've since re-checked the stove we're purchasing, and realized that it will cover that area!
So, back to Pottery Painters Plus (the folks there are great) to pick up the 3 tiles we made last week, and to paint up 3 more. We're going to arrange them on the wall, higher up. Rather than arrange our custom tiles horizontally, they'll be vertical on either side of the mural on the wall.
Locked ourselves out of the house, so we couldn't do any actual work.
Starting to look like we're going to put down an Adirondack White Pine floor from Pioneer Millworks in the old kitchen/new family room.